UltraFloor Level IT Base Heavy Duty
Product code: LEVEL IT BASE
Next day delivery
If all of your items are available for click & collect, you'll be able to select a location for pickup at checkout.
Stock availability for UltraFloor Level IT Base Heavy Duty
Leeds
Unit 14 Gelderd Trading Estate, West Vale, Leeds, , LS12 6BD, .
Glasgow
Unit 30 Deerdykes View, Westfield, Cumbernauld, Glasgow, G68 9HN, .
Essex
The Garage Unit. The Forge, Ockendon Road, North Ockendon, , RM14 3PS, .
Caldicot
Unit 16A Norman Way, Severn Bridge Industrial Estate, Caldicot, Monmouthshire, NP26 5PT, .
- High compressive strength
- Ideal for use with Level IT Top
- Pump or trowel applied
- Walk on: 3 hours
- Moisture tolerant
- Coverage: approx 3m² at 5mm
- 5-50mm thickness
- Working time 30-40 minutes
- Internal floors
- Size: 25kg
- NBS Source registered for ease of specification
Orders placed before 2pm Monday – Friday (excluding Bank Holidays) will be dispatched the same day if ‘Next Day Delivery’ is displayed on the product listing. Orders placed after this time will be dispatched the following working day.
Orders for non-stock items will be dispatched within 3-5 working days unless contacted by Customer Services.
Saturday and timed deliveries are available on request. Please contact [email protected] or call 01708 855 698 for more information.
Please note postcodes in some areas of the Scottish Highlands and offshore addresses require a delivery surcharge and in some cases can take longer to be delivered. Please contact [email protected] or call 01708 855 698 for a delivery quote.
AB36-38, AB55-56, FK17-21, G83, GY9, HS1-9, IM (ALL), IV (ALL), JE (ALL), KA27, KA28, KW0-14, KW15-17, PA20-78, PH15-18, PH19-29, PH32-33, PH45-48, PH30-31, PH34-44, PH49-99, PO38, ZE (ALL)
It is the customers responsibility to provide an accurate delivery address. If the courier is unable to deliver your order due to issues with access to the delivery address, your goods will be returned to the local delivery depot for delivery on the next working day. Please note a redelivery charge of up to £89 plus VAT per pallet may be applied. If your order is undelivered and returned to us a restocking fee may also be applied.
Please inform us of any delivery restrictions (eg weight restrictions, narrow roads). Failure to do so may incur a redelivery charge if the courier cannot access the delivery address due to undeclared or incorrect delivery restrictions. A redelivery charge of up to £89 plus VAT per pallet may be applied.
If your order is over 150kg it may be delivered on a pallet. The courier will notify you of a two hour delivery window. In the event that no one is available at the address to receive the delivery a charge of up to £89 plus VAT per pallet may be applied for redelivery.
You may also like
UltraFloor Level IT Base FAQs
What is UltraFloor Level IT Base?
UltraFloor Level IT Base is a rapid setting and hardening, high strength, single part, smoothing underlayment suitable for use in industrial , commercial and domestic flooring installations.
How do I prepare the surface before applying UltraFloor Level IT Base?
UltraFloor Level IT Base has a moisture tolerant formulation and can be applied to cementitious subfloors where there is an absence of a base DPM provided there is no risk of hydrostatic pressure from the subground. If systems incorporating Level IT Base are to receive resin coatings or floor coverings then the product must be protected from rising moisture including residual construction moisture by the application of Ultra Floor DPM IT Rapid Curing Primer Membrane to the subfloor.
Any surface laitance, adhesive residue, paints, existing smoothing underlayments and any other materials which will hinder Level IT BASE’s bond with the subfloor should be mechanically removed. The subfloor should be clean, dry and sound. BS8204-3 recommends a minimum surface tensile strength of 0.8N/mm2 for concrete bases to receive wearing or levelling screeds. For heavy duty locations or where a subsequent resin coating may be applied, the minimum surface tensile strength should be 1.5N/mm2 . The area should also be dust free prior to any primer application.
Do I need to use a primer with UltraFloor Level IT Base?
Yes, subfloors should always be primed prior to applications of Level IT Base with Prime IT Multi-surface primer (MSP). This will enhance the application characteristics and improve the adhesion between Level IT Base and the substrate. Prime IT MSP applications should be in a thin uniform coating avoiding pooling and puddling of primer. The dry film should be a pink colour. All dilution ratios are water:primer.
Drying times are for guidance only and will be subject to subfloor absorbency, temperature, building humidity and airflow. Level IT Base applications must be made within 36 hours of primer curing.
Can UltraFloor Level IT Base be applied by trowel and pump?
Yes, UltraFloor Level IT Base can be applied by either pump or hand mixed.






